Bendix Electric, Inc.

How many solar installs has Bendix Electric, Inc. done in California, and which license number is on its installs?

Bendix Electric, Inc. has 67 residential solar installs interconnected in California, active in the records from 2012 through 2023 (Aug 3, 2012 to Oct 16, 2023), most of them in Tuolumne County (63), Calaveras County (3) and Orange County (1). The license number recorded on most of its installs, 390248, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
67
Last 24 months
0
Total capacity
600.4 kW DC
Median system size
8.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 67 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 3, 2012
Latest install
Oct 16, 2023
Counties
3
Utilities
PGE 66, SCE 1
CSLB license
390248

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
201320
201420
201570
2016110
2017150
2018100
201950
202070
202120
202230
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 67 interconnected installs with a tariff recorded (67) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02435.8%not counted
NEM 2.04364.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Bendix Electric, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Bendix Electric, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 62 of Bendix Electric, Inc.’s 67 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 54.8%) used modules recorded as Qcells.

Across all years, 67 of Bendix Electric, Inc.’s 67 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (40, 59.7%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells034
SolarWorld010
Canadian Solar09
JinkoSolar03
Trina Solar02
Inverter makerSolarEdge040
Fronius012
Enphase011
SMA03
PV Powered02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 67 installs, inverters on 67. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
390248Not found in the CSLB License Master file pulled Nov 4, 202663

License numbers are the ones the utilities recorded on the interconnection applications (63 of 67 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Tuolumne63
Calaveras3
Orange1

Top cities

CityInstalls
Sonora38
Jamestown10
Tuolumne5
Twain Harte4
Columbia2
Soulsbyville2
Angels Camp1
Arnold1
Copperopolis1
Groveland1
Lake Forest1
Moccasin1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bendix Electric, Inc.46
BENDIX ELECTRIC INC14
Bendix Electric, Inc dba Mr. Electric of2
BENDIX ELECTRIC1
Bendix Electric Inc.1
Bendix Electric, Inc1
Bendix Electric, Inc DBA Mr. Electric of1
Bendix Electric, Inc, dba Mr. Electric o1

Common questions

Where does Bendix Electric, Inc. install solar?

Its installs are spread across 3 counties. The most are in Tuolumne County (63 installs), followed by Calaveras County (3).

How often does Bendix Electric, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Bendix Electric, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 67 interconnected installs with a tariff recorded (67) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.