YouVee Solar

How many solar installs has YouVee Solar done in California, and which license number is on its installs?

YouVee Solar has 139 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Dec 19, 2011 to May 6, 2026), most of them in Kern County (137) and San Bernardino County (2). CSLB lists license 1039465 (YOUVEE SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to YouVee Solar here carry more than one CSLB license number: 1039465 on 77 (CSLB holder YOUVEE SOLAR LLC, Ridgecrest), 999171 on 46 (not found in the CSLB License Master file) and 965340 on 14 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
139
Last 24 months
3
Total capacity
990.2 kW DC
Median system size
6.8 kW DC
With battery storage
4.3% all time; 66.7% last 24 months
Third-party owned
0.0% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest May 6, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (6 installs list a capacity)
First install
Dec 19, 2011
Latest install
May 6, 2026
Counties
2
Utilities
SCE 139
CSLB license
1039465, 999171, 965340

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201220
201320
201480
2015190
2016130
2017100
2018150
2019140
2020150
2021120
2022130
2023103
202421
202521
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 139 interconnected installs (2.9% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05136.7%not counted
NEM 2.08460.4%2 (2.4%)
Net Billing Tariff42.9%4 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on YouVee Solar’s installs. No residential system in the file lists a third-party owner name that matches YouVee Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of YouVee Solar’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as Trina Solar.

In the last 24 months, 3 of YouVee Solar’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of YouVee Solar’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

5 of 6 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar3not in top list
LG127
Inverter makerEnphase3113
Battery makerEnphase25

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 123 of 139 installs, inverters on 139. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1039465YOUVEE SOLAR LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 16, 2018May 31, 202877
999171Not found in the CSLB License Master file pulled Nov 4, 202646
965340Not found in the CSLB License Master file pulled Nov 4, 202614

License numbers are the ones the utilities recorded on the interconnection applications (138 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1039465. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern137
San Bernardino2

Top cities

CityInstalls
Ridgecrest129
Inyokern8
Trona2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
YOUVEE SOLAR LLC59
YouVee Solar35
YOUVEE SOLAR26
YouVee Solar LLC18
Youvee Solar1

Common questions

Where does YouVee Solar install solar?

Its installs are spread across 2 counties. The most are in Kern County (137 installs), followed by San Bernardino County (2).

How often does YouVee Solar install batteries with solar?

4.3% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many YouVee Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 139 interconnected installs (2.9% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.