SLO Circuit Electrical

How many solar installs has SLO Circuit Electrical done in California, and which license number is on its installs?

SLO Circuit Electrical has 174 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jun 20, 2016 to Aug 31, 2026), most of them in San Luis Obispo County (153) and Santa Barbara County (21). CSLB lists license 951325 (SLO CIRCUIT ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
174
Last 24 months
33
Total capacity
1,036.6 kW DC
Median system size
5.2 kW DC
With battery storage
14.4% all time; 36.4% last 24 months
Third-party owned
0.0% of 174 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
23 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
14 kWh (25 installs list a capacity)
First install
Jun 20, 2016
Latest install
Aug 31, 2026
Counties
2
Utilities
PGE 174
CSLB license
951325

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016110
201750
201840
201991
202091
2021142
2022383
2023390
2024177
2025164
2026 (through Aug 31, 2026)127

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

23 of its 174 interconnected installs (13.2% of the 174 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0116.3%not counted
NEM 2.014080.5%13 (9.3%)
Net Billing Tariff2313.2%12 (52.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SLO Circuit Electrical’s installs. No residential system in the file lists a third-party owner name that matches SLO Circuit Electrical exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 29 of SLO Circuit Electrical’s 33 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 55.2%) used modules recorded as SEG Solar.

In the last 24 months, 33 of SLO Circuit Electrical’s 33 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 63.6%) used inverters recorded as SolarEdge.

In the last 24 months, 4 of SLO Circuit Electrical’s 33 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as LG.

17 of 25 battery-paired PG&E and SCE installs (68.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar1641
Hyundai415
Briggs & Stratton, LLC3not in top list
REC366
JinkoSolar27
Inverter makerSolarEdge21126
Enphase719
Sol-Ark44
SMA225
EG41not in top list
Battery makerLG412

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 163 of 174 installs, inverters on 174. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SLO Circuit Electrical as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 38 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 13, 2024 to May 13, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled138$8,597

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage138$8,5970$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
951325SLO CIRCUIT ELECTRICAL (Corporation)CLEARC-10 Electrical ContractorAug 18, 2010Oct 31, 2027174

License numbers are the ones the utilities recorded on the interconnection applications (174 of 174 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 951325. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Luis Obispo153
Santa Barbara21

Top cities

CityInstalls
San Luis Obispo40
Arroyo Grande34
Santa Maria21
Los Osos19
Pismo Beach17
Cayucos16
Paso Robles7
Atascadero5
Morro Bay5
Templeton3
Cambria2
Nipomo2
Creston1
Oceano1
San Miguel1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SLO CIRCUIT ELECTRICAL149
SLO Circuit Electrical25

Common questions

Where does SLO Circuit Electrical install solar?

Its installs are spread across 2 counties. The most are in San Luis Obispo County (153 installs), followed by Santa Barbara County (21).

How often does SLO Circuit Electrical install batteries with solar?

14.4% of its interconnected solar installs include battery storage across all years, and 36.4% in the last 24 months (12 of 33).

How many SLO Circuit Electrical installs are under NEM 3.0 (the Net Billing Tariff)?

23 of its 174 interconnected installs (13.2% of the 174 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.