Reed Construction has 63 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Jun 5, 2007 to Aug 31, 2026), most of them in Tulare County (57), Kern County (4) and Santa Cruz County (1). CSLB lists license 933472 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
6
Total capacity
634.5 kW DC
Median system size
9.1 kW DC
With battery storage
12.7% all time; 83.3% last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
14.3 kWh (8 installs list a capacity)
First install
Jun 5, 2007
Latest install
Aug 31, 2026
Counties
4
Utilities
SCE 57, PGE 6
CSLB license
933472

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200800
200900
201000
201100
201220
201380
201470
201550
201660
201740
201831
201910
202020
202130
202240
202380
202432
202544
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 63 interconnected installs (11.1% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03250.8%not counted
NEM 2.02438.1%3 (12.5%)
Net Billing Tariff711.1%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Reed Construction’s installs. No residential system in the file lists a third-party owner name that matches Reed Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Reed Construction’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as EG4.

In the last 24 months, 6 of Reed Construction’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as EG4.

In the last 24 months, none of Reed Construction’s 6 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 8 battery-paired PG&E and SCE installs (25.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG444
LONGi39
CertainTeed1not in top list
HomeGrid1not in top list
Phono Solar Technology1not in top list
Inverter makerEG444
Enphase145
Sol-Ark1not in top list
Battery makerSolarEdge01
sonnen01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 45 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
933472Sole owner license (name not shown)CLEARB General Building ContractorJun 5, 2009Jun 30, 202761

License numbers are the ones the utilities recorded on the interconnection applications (62 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 933472. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tulare57
Kern4
Santa Cruz1
Shasta1

Top cities

CityInstalls
Porterville20
Strathmore11
Springville10
Visalia6
Bakersfield4
Exeter3
Lindsay3
Terra Bella2
Aptos1
Ducor1
Earlimart1
Igo1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
REED CONSTRUCTION41
Reed Construction21
REED CONSTRUCTION CO1

Common questions

Where does Reed Construction install solar?

Its installs are spread across 4 counties. The most are in Tulare County (57 installs), followed by Kern County (4).

How often does Reed Construction install batteries with solar?

12.7% of its interconnected solar installs include battery storage across all years, and 83.3% in the last 24 months (5 of 6).

How many Reed Construction installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 63 interconnected installs (11.1% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.