LinkUs Energy

How many solar installs has LinkUs Energy done in California, and which license number is on its installs?

LinkUs Energy has 70 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Feb 4, 2025 to Aug 24, 2026), most of them in Fresno County (70). CSLB lists license 782366 (LINKUS ENTERPRISES LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-7, C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
70
Last 24 months
70
Total capacity
477.4 kW DC
Median system size
5.8 kW DC
With battery storage
14.3% all time; 14.3% last 24 months
Third-party owned
0.0% of 70 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
46 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
Median battery size
1 kWh (9 installs list a capacity)
First install
Feb 4, 2025
Latest install
Aug 24, 2026
Counties
1
Utilities
PGE 70
CSLB license
782366

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
2025435
2026 (through Aug 31, 2026)275

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

46 of its 70 interconnected installs (65.7% of the 70 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 15.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02434.3%3 (12.5%)
Net Billing Tariff4665.7%7 (15.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on LinkUs Energy’s installs. No residential system in the file lists a third-party owner name that matches LinkUs Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 70 of LinkUs Energy’s 70 installs name a module maker in the “Generator Manufacturer” fields, and most of those (45, 64.3%) used modules recorded as Qcells.

In the last 24 months, 70 of LinkUs Energy’s 70 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 75.7%) used inverters recorded as Tesla.

In the last 24 months, 7 of LinkUs Energy’s 70 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 85.7%) used batteries recorded as Tesla.

7 of 10 battery-paired PG&E and SCE installs (70.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4545
Thornova Solar1818
Solar4America Technology Inc.44
Canadian Solar11
Mission Solar11
Inverter makerTesla5353
Enphase1212
APsystems (Altenergy Power System)55
Battery makerTesla66
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 70 installs, inverters on 70. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
782366LINKUS ENTERPRISES LLC (Limited Liability)CLEARC-7; C-10 Electrical ContractorAug 2, 2000Sep 30, 202770

License numbers are the ones the utilities recorded on the interconnection applications (70 of 70 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 782366. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LinkUs Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County78236611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno70

Top cities

CityInstalls
Fresno67
Clovis3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LinkUs Energy70

Common questions

Where does LinkUs Energy install solar?

Its installs are spread across 1 county. The most are in Fresno County (70 installs).

How often does LinkUs Energy install batteries with solar?

14.3% of its interconnected solar installs include battery storage across all years, and 14.3% in the last 24 months (10 of 70).

How many LinkUs Energy installs are under NEM 3.0 (the Net Billing Tariff)?

46 of its 70 interconnected installs (65.7% of the 70 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 15.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.