Kerr Electric Service

How many solar installs has Kerr Electric Service done in California, and which license number is on its installs?

Kerr Electric Service has 34 residential solar installs interconnected in California, active in the records from 2008 through 2025 (Mar 12, 2008 to Jun 3, 2025), most of them in Sonoma County (30), Marin County (2) and Lake County (1). CSLB lists license 532205 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
3
Total capacity
197 kW DC
Median system size
5.7 kW DC
With battery storage
5.9% all time; 66.7% last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Jun 3, 2025
Ownership types recorded
none recorded
First install
Mar 12, 2008
Latest install
Jun 3, 2025
Counties
4
Utilities
PGE 34
CSLB license
532205

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200820
200920
201030
201130
201210
201310
201400
201500
201600
201700
201800
201930
202050
202130
202210
202350
202420
202532
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 34 interconnected installs (11.8% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01235.3%not counted
NEM 2.01852.9%0 (0.0%)
Net Billing Tariff411.8%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Kerr Electric Service’s installs. No residential system in the file lists a third-party owner name that matches Kerr Electric Service exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Kerr Electric Service’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as Mission Solar.

In the last 24 months, 3 of Kerr Electric Service’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of Kerr Electric Service’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar314
Inverter makerEnphase325
Battery makerEnphase22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
532205Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 8, 1988Sep 30, 202822

License numbers are the ones the utilities recorded on the interconnection applications (22 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 532205. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sonoma30
Marin2
Lake1
San Francisco1

Top cities

CityInstalls
Santa Rosa14
Petaluma5
Sebastopol4
Windsor3
Novato2
Cotati1
Guerneville1
Healdsburg1
Hidden Valley Lake1
Rohnert Park1
San Francisco1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KERR ELECTRIC SERVICE20
Kerr Electric Service14

Common questions

Where does Kerr Electric Service install solar?

Its installs are spread across 4 counties. The most are in Sonoma County (30 installs), followed by Marin County (2).

How often does Kerr Electric Service install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many Kerr Electric Service installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 34 interconnected installs (11.8% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.