IMPACT ELECTRIC SUN INC

How many solar installs has IMPACT ELECTRIC SUN INC done in California, and which license number is on its installs?

IMPACT ELECTRIC SUN INC has 93 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Apr 20, 2022 to Mar 6, 2026), most of them in Kern County (91) and Tulare County (2). CSLB lists license 1089422 (IMPACT ELECTRIC SUN INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
93
Last 24 months
20
Total capacity
966.8 kW DC
Median system size
9.6 kW DC
With battery storage
23.7% all time; 90.0% last 24 months
Third-party owned
8.6% of 93 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
22 installs, latest Feb 24, 2026
Ownership types recorded
PPA 8
Median battery size
14.3 kWh (1 installs list a capacity)
First install
Apr 20, 2022
Latest install
Mar 6, 2026
Counties
2
Utilities
PGE 85, SCE 8
CSLB license
1089422

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022170
2023512
202495
20251414
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

22 of its 93 interconnected installs (23.7% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07176.3%0 (0.0%)
Net Billing Tariff2223.7%22 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 8 of IMPACT ELECTRIC SUN INC’s installs the utility recorded a third-party ownership type: PPA 8, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches IMPACT ELECTRIC SUN INC exactly.

Third-party owner named on its installsInstalls
Lightreach5
PALMETTO3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 19 of IMPACT ELECTRIC SUN INC’s 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 57.9%) used modules recorded as United Renewable Energy.

In the last 24 months, 20 of IMPACT ELECTRIC SUN INC’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 95.0%) used inverters recorded as Enphase.

In the last 24 months, 16 of IMPACT ELECTRIC SUN INC’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 100.0%) used batteries recorded as Enphase.

20 of 22 battery-paired PG&E and SCE installs (90.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy1166
JinkoSolar77
EG411
Hyperion Solar11
Inverter makerEnphase1989
EG411
Battery makerEnphase1620

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 93 installs, inverters on 93. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1089422IMPACT ELECTRIC SUN INC (Corporation)CLEARC-10 Electrical ContractorApr 4, 2022Apr 30, 202893

License numbers are the ones the utilities recorded on the interconnection applications (93 of 93 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1089422. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern91
Tulare2

Top cities

CityInstalls
Bakersfield80
Tehachapi3
Glennville2
Shafter2
Wasco2
Arvin1
Earlimart1
Frazier Park1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
IMPACT ELECTRIC SUN INC93

Common questions

Where does IMPACT ELECTRIC SUN INC install solar?

Its installs are spread across 2 counties. The most are in Kern County (91 installs), followed by Tulare County (2).

How often does IMPACT ELECTRIC SUN INC install batteries with solar?

23.7% of its interconnected solar installs include battery storage across all years, and 90.0% in the last 24 months (18 of 20).

How many IMPACT ELECTRIC SUN INC installs are under NEM 3.0 (the Net Billing Tariff)?

22 of its 93 interconnected installs (23.7% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.