TITANIUM SOLAR LLC: latest installs on record in California
Is TITANIUM SOLAR LLC still installing solar in California?
The most recent install credited to TITANIUM SOLAR LLC in California’s interconnection data was approved in August 2026; it has 5 in the last 12 complete months (September 2025 through August 2026). The license number recorded on most of those installs, 1076974, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
- Latest install approved
- Aug 28, 2026
- Last 12 complete months
- 5 installs, September 2025 through August 2026
- Last 24 months
- 89 installs
- All time
- 2,652 installs, first approved Nov 24, 2021
- License on most recent installs
- 1076974, not found in the CSLB License Master file pulled Nov 4, 2026
- Full record
- TITANIUM SOLAR LLC installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to TITANIUM SOLAR LLC |
|---|---|
| August 2026 | 1 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 0 |
| April 2026 | 1 |
| March 2026 | 0 |
| February 2026 | 1 |
| January 2026 | 1 |
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 1 |
| Total | 5 |
Net Billing Tariff installs
855 of the installs credited to TITANIUM SOLAR LLC (32.2% of the 2,652 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.4% of those on PG&E and SCE records include battery storage. The latest was approved Aug 28, 2026.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 4 | 0 |
| 2022 | 617 | 1 |
| 2023 | 1,634 | 74 |
| 2024 | 376 | 215 |
| 2025 | 17 | 10 |
| 2026 (through Aug 31, 2026) | 4 | 1 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 1076974 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 5 | |||
Names written on these installs: TITANIUM SOLAR LLC (5). 5 of the 5 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to TITANIUM SOLAR LLC approved?
The latest App Approved date on an install credited to TITANIUM SOLAR LLC is Aug 28, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Nov 24, 2021.
How many solar installs has TITANIUM SOLAR LLC had in California in the last 12 months?
5 residential solar installs credited to TITANIUM SOLAR LLC were approved for interconnection from September 2025 through August 2026. Months with none recorded: October 2025, November 2025, December 2025, March 2026, May 2026, June 2026 and July 2026. Across all years it has 2,652.
Does a recent install mean TITANIUM SOLAR LLC is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
Records last pulled Nov 16, 2026. Every entry links to the original public record.