Solcius: latest installs on record in California

Is Solcius still installing solar in California?

The most recent install credited to Solcius in California’s interconnection data was approved in May 2026; it has 17 in the last 12 complete months (September 2025 through August 2026). The license number recorded on most of those installs, 976336, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
May 26, 2026
Last 12 complete months
17 installs, September 2025 through August 2026
Last 24 months
51 installs
All time
10,033 installs, first approved Jul 24, 2014
License on most recent installs
976336, not found in the CSLB License Master file pulled Nov 4, 2026
Full record
Solcius installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Solcius
August 20260
July 20260
June 20260
May 20262
April 20262
March 20261
February 20263
January 20260
December 20252
November 20253
October 20254
September 20250
Total17

Net Billing Tariff installs

159 of the installs credited to Solcius (1.6% of the 10,033 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.2% of those on PG&E and SCE records include battery storage. The latest was approved Nov 19, 2025.

Installs by year

YearInstalls interconnectedWith battery storage
20141950
20151,3550
20168690
20177860
20181,5150
20199850
20205280
20216790
20221,4512
20231,50198
202412533
2025363
2026 (through Aug 31, 2026)81

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
976336Not found in the CSLB License Master file pulled Nov 4, 202617

Names written on these installs: SOLCIUS LLC (13), Solcius (4). 17 of the 17 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other installer names in the records

Installer names that share a license number with Solcius, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
R S ENERGY CALIFORNIA LLCsame license 976336September 2014067

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Solcius approved?

The latest App Approved date on an install credited to Solcius is May 26, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Jul 24, 2014.

How many solar installs has Solcius had in California in the last 12 months?

17 residential solar installs credited to Solcius were approved for interconnection from September 2025 through August 2026. Months with none recorded: September 2025, January 2026, June 2026, July 2026 and August 2026. Across all years it has 10,033.

Does a recent install mean Solcius is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.