HORIZON CONSTRUCTION
How many solar installs has HORIZON CONSTRUCTION done in California, and which license number is on its installs?
HORIZON CONSTRUCTION has 88 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Dec 9, 2015 to Dec 13, 2024), most of them in Shasta County (73) and Tehama County (15). The license number recorded on most of its installs, 528210, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 88
- Last 24 months
- 1
- Total capacity
- 712 kW DC
- Median system size
- 7.6 kW DC
- With battery storage
- 2.3% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 88 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Dec 9, 2015
- Latest install
- Dec 13, 2024
- Counties
- 2
- Utilities
- PGE 88
- CSLB license
- 528210
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 1 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 1 | 0 |
| 2019 | 6 | 0 |
| 2020 | 17 | 0 |
| 2021 | 16 | 0 |
| 2022 | 26 | 0 |
| 2023 | 20 | 2 |
| 2024 | 1 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1 | 1.1% | not counted |
| NEM 2.0 | 87 | 98.9% | 2 (2.3%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on HORIZON CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches HORIZON CONSTRUCTION exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1 of HORIZON CONSTRUCTION’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.
In the last 24 months, 1 of HORIZON CONSTRUCTION’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.
In the last 24 months, none of HORIZON CONSTRUCTION’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1 | 44 |
| Inverter maker | Enphase | 1 | 82 |
| Battery maker | Enphase | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 82 of 88 installs, inverters on 88. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 528210 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 88 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (88 of 88 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- Horizon Electric Solar: 37 installs, license 528210
Counties
Top cities
| City | Installs |
|---|---|
| Anderson | 22 |
| Redding | 19 |
| Cottonwood | 16 |
| Red Bluff | 7 |
| Palo Cedro | 5 |
| Shingletown | 4 |
| Burney | 2 |
| Oak Run | 2 |
| Whitmore | 2 |
| Bella Vista | 1 |
| Fall River Mills | 1 |
| French Gulch | 1 |
| Lakehead | 1 |
| Mcarthur | 1 |
| Millville | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| HORIZON CONSTRUCTION | 86 |
| Horizon Construction | 2 |
Common questions
Where does HORIZON CONSTRUCTION install solar?
Its installs are spread across 2 counties. The most are in Shasta County (73 installs), followed by Tehama County (15).
How often does HORIZON CONSTRUCTION install batteries with solar?
2.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).
How many HORIZON CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.