HODGES WESLEY

How many solar installs has HODGES WESLEY done in California, and which license number is on its installs?

HODGES WESLEY has 43 residential solar installs interconnected in California, active in the records from 2019 through 2020 (Nov 18, 2019 to Sep 18, 2020), most of them in Humboldt County (43). CSLB lists license 1026026 (ABUNDANCE BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
0
Total capacity
312 kW DC
Median system size
6.6 kW DC
With battery storage
60.5% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
81 kWh (26 installs list a capacity)
First install
Nov 18, 2019
Latest install
Sep 18, 2020
Counties
1
Utilities
PGE 43
CSLB license
1026026

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201972
20203624
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 43 interconnected installs with a tariff recorded (43) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.043100.0%26 (60.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HODGES WESLEY’s installs. No residential system in the file lists a third-party owner name that matches HODGES WESLEY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of HODGES WESLEY’s 43 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 48.8%) used modules recorded as Qcells.

Across all years, 43 of HODGES WESLEY’s 43 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (20, 46.5%) used inverters recorded as Pika Energy.

Across all years, 9 of HODGES WESLEY’s 43 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 88.9%) used batteries recorded as Generac.

9 of 26 battery-paired PG&E and SCE installs (34.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells020
JinkoSolar015
Pika Energy015
Heliene04
Canadian Solar01
Inverter makerPika Energy020
SMA011
Generac07
SolarEdge03
Fronius02
Battery makerGenerac08
Fortress Power LLC01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1026026ABUNDANCE BUILDERS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 21, 2017Sep 30, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1026026. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Humboldt43

Top cities

CityInstalls
Eureka11
Mckinleyville10
Arcata8
Fortuna5
Trinidad4
Bayside1
Blocksburg1
Carlotta1
Kneeland1
Rio Dell1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HODGES WESLEY43

Common questions

Where does HODGES WESLEY install solar?

Its installs are spread across 1 county. The most are in Humboldt County (43 installs).

How often does HODGES WESLEY install batteries with solar?

60.5% of its interconnected solar installs include battery storage across all years.

How many HODGES WESLEY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 43 interconnected installs with a tariff recorded (43) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.