Electricraft Inc.

How many solar installs has Electricraft Inc. done in California, and which license number is on its installs?

Electricraft Inc. has 228 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jan 20, 2009 to Apr 13, 2026), most of them in San Luis Obispo County (223) and Santa Barbara County (5). CSLB lists license 468443 (ELECTRICRAFT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-11, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
228
Last 24 months
8
Total capacity
1,269 kW DC
Median system size
4.5 kW DC
With battery storage
1.3% all time; 12.5% last 24 months
Third-party owned
0.0% of 228 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Mar 12, 2026
Ownership types recorded
none recorded
First install
Jan 20, 2009
Latest install
Apr 13, 2026
Counties
2
Utilities
PGE 228
CSLB license
468443

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200990
201040
201170
201270
2013100
2014210
2015380
2016170
201760
2018130
2019221
2020130
2021130
2022180
2023160
202471
202540
2026 (through Aug 31, 2026)31

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 228 interconnected installs (1.8% of the 228 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011349.6%not counted
NEM 2.011148.7%1 (0.9%)
Net Billing Tariff41.8%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Electricraft Inc.’s installs. No residential system in the file lists a third-party owner name that matches Electricraft Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Electricraft Inc.’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used modules recorded as JinkoSolar.

In the last 24 months, 8 of Electricraft Inc.’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Electricraft Inc.’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar523
REC321
Inverter makerEnphase8140
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 225 of 228 installs, inverters on 228. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Electricraft Inc. as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 14 kWh of storage. 1 have the status Paid, with $3,839 in current incentive allocations. Applications were received from Dec 13, 2018 to Dec 13, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$3,839

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage114$3,8391$3,839

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
468443ELECTRICRAFT INC (Corporation)CLEARC-10 Electrical Contractor; C-11Jan 22, 1985Jan 31, 2027183

License numbers are the ones the utilities recorded on the interconnection applications (183 of 228 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 468443. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Luis Obispo223
Santa Barbara5

Top cities

CityInstalls
San Luis Obispo73
Arroyo Grande28
Atascadero28
Los Osos16
Paso Robles14
Morro Bay10
Cayucos9
Nipomo7
Templeton7
Avila Beach6
Creston6
Grover Beach6
Santa Margarita6
San Miguel5
Santa Maria4

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Electricraft Inc.96
ELECTRICRAFT INC83
Electricraft Inc23
Electricraft, Inc10
Electricraft, Inc.9
Electricraft5
electricraft inc1
ELectricraft, Inc.1

Common questions

Where does Electricraft Inc. install solar?

Its installs are spread across 2 counties. The most are in San Luis Obispo County (223 installs), followed by Santa Barbara County (5).

How often does Electricraft Inc. install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years, and 12.5% in the last 24 months (1 of 8).

How many Electricraft Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 228 interconnected installs (1.8% of the 228 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.