CONCEPTIONAL ELECTRIC
How many solar installs has CONCEPTIONAL ELECTRIC done in California, and which license number is on its installs?
CONCEPTIONAL ELECTRIC has 54 residential solar installs interconnected in California, active in the records from 2019 through 2022 (Nov 14, 2019 to May 26, 2022), most of them in Humboldt County (54). CSLB lists license 994153 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 54
- Last 24 months
- 0
- Total capacity
- 325.3 kW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 46.3% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 54 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- Median battery size
- 10.1 kWh (25 installs list a capacity)
- First install
- Nov 14, 2019
- Latest install
- May 26, 2022
- Counties
- 1
- Utilities
- PGE 54
- CSLB license
- 994153
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2019 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2019 | 6 | 0 |
| 2020 | 27 | 15 |
| 2021 | 17 | 8 |
| 2022 | 4 | 2 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 54 | 100.0% | 25 (46.3%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on CONCEPTIONAL ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches CONCEPTIONAL ELECTRIC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 53 of CONCEPTIONAL ELECTRIC’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 52.8%) used modules recorded as Qcells.
Across all years, 54 of CONCEPTIONAL ELECTRIC’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 50.0%) used inverters recorded as Generac.
Across all years, 16 of CONCEPTIONAL ELECTRIC’s 54 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 100.0%) used batteries recorded as Generac.
16 of 25 battery-paired PG&E and SCE installs (64.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 0 | 28 |
| JinkoSolar | 0 | 11 | |
| Pika Energy | 0 | 8 | |
| Trina Solar | 0 | 7 | |
| Heliene | 0 | 3 | |
| Inverter maker | Generac | 0 | 27 |
| Pika Energy | 0 | 14 | |
| SMA | 0 | 8 | |
| SolarEdge | 0 | 5 | |
| Battery maker | Generac | 0 | 16 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 54 installs, inverters on 54. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names CONCEPTIONAL ELECTRIC as developer on 0 battery storage projects and as installer on 7 (0 name it as both), 7 projects in all with 66 kWh of storage. 7 have the status Paid, with $13,056 in current incentive allocations. Applications were received from Dec 3, 2020 to Mar 10, 2021.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 7 | 66 | $13,056 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 7 | 66 | $13,056 | 7 | $13,056 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 994153 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Jun 28, 2014 | Jun 30, 2028 | 54 |
License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 994153. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- MIKE BROWN CONCEPTUAL ELECTRIC: 40 installs, license 994153
Counties
| County | Installs |
|---|---|
| Humboldt | 54 |
Top cities
| City | Installs |
|---|---|
| Eureka | 26 |
| Arcata | 9 |
| Fortuna | 6 |
| Mckinleyville | 4 |
| Bayside | 3 |
| Hydesville | 2 |
| Blue Lake | 1 |
| Carlotta | 1 |
| Ferndale | 1 |
| Trinidad | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| CONCEPTIONAL ELECTRIC | 54 |
Common questions
Where does CONCEPTIONAL ELECTRIC install solar?
Its installs are spread across 1 county. The most are in Humboldt County (54 installs).
How often does CONCEPTIONAL ELECTRIC install batteries with solar?
46.3% of its interconnected solar installs include battery storage across all years.
How many CONCEPTIONAL ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.